The attachement of the gantry has been ripped off and needs to be carefully repaired, the loads while foiling are very high at these points. A bar from the crown also needs repair, loads there are also very high. The boom needs to be fixed with the fixation of the spreaders on the mast. A new gantry must also be built, no idea how to do that. Quite a program ahead, no idea when will be foiling next.
Sunday, August 31, 2008
Damage assessment
The attachement of the gantry has been ripped off and needs to be carefully repaired, the loads while foiling are very high at these points. A bar from the crown also needs repair, loads there are also very high. The boom needs to be fixed with the fixation of the spreaders on the mast. A new gantry must also be built, no idea how to do that. Quite a program ahead, no idea when will be foiling next.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment