Sunday, August 31, 2008

Damage assessment



The attachement of the gantry has been ripped off and needs to be carefully repaired, the loads while foiling are very high at these points. A bar from the crown also needs repair, loads there are also very high. The boom needs to be fixed with the fixation of the spreaders on the mast. A new gantry must also be built, no idea how to do that. Quite a program ahead, no idea when will be foiling next.

No comments: