Monday, June 16, 2014

Machine sandpaper

Irie was previously dry kept and therefore had no antifouling.  The plan is to have her mored and kept in the water at all times, an antifouling is therefore required.  The previous paint must be removed for the new antifouling to adhere.  It's quite labor intensive and under 40C but with a nice sea breeze it's no joke.

The reefer container also gets a new split AC unit (Mitsubishi) which only requires a single phase and does not require the power cable to cross the road which makes things easy.  The shelves are now also set at the right height.




No comments: